INFRASTRUCTURE WORKER IN OPTICAL FIBER NETWORKS [Finland]


 

Removing the pavement in certain portions if any exist;
Manual excavation if the length of the excavation is below 5 meters - trench with a width of 10 cm, a depth of 30 cm;
Mechanical excavation if the length of the excavation is over 5 meters (Ditch Witch Zahn R300 or Vermeer SPX25 - training is given for the use of digging equipment).
Laying the optical fiber tubes according to the instructions given by the coordinator and depending on the digging method.

$ads={1}

Partial covering of the trench (10 cm) and placement of the warning band in the trench;
Complete covering of the ditch;
Placing the pavement in its original shape and leveling;
Sanding the joints between pavers and sweeping away sand and debris.

Yhteystiedot: CV to [email protected]
Työpaikan osoite:
Työ alkaa: Työskentely alkaa mahdollisimman pian
Työaika: Kokoaikatyö
Työn kesto: Toistaiseksi voimassa oleva
Hakuaika päättyy: 29.06.2023 21:00
Jätä hakemus: https://tyomarkkinatori.fi/henkiloasiakkaat/avoimet-tyopaikat/02c8f850-7...
Ilmoitus jätetty: 25.05.2023 17:38
Työmarkkinatorin ilmoitusnumero: 02c8f850-7874-40cb-aee1-7e7ef228d175

Lähde: Työmarkkinatorin asiakastietojärjestelmä

.


S-Infra Oy
Tampere
Pori
Kokopäiväinen, Vakituinen

Julkaistu 25.05.2023

$ads={2}


 

.

Post a Comment

Previous Post Next Post

Sponsored Ads

نموذج الاتصال